{"id":17052,"date":"2016-11-21T07:22:24","date_gmt":"2016-11-21T07:22:24","guid":{"rendered":"http:\/\/www.safetyangel.com\/recdev\/?page_id=17052"},"modified":"2016-11-21T07:29:37","modified_gmt":"2016-11-21T07:29:37","slug":"example-2-risk-based-inspection-analysis-of-a-reactor-casing","status":"publish","type":"page","link":"http:\/\/www.safetyangel.com\/recdev\/example-2-risk-based-inspection-analysis-of-a-reactor-casing\/","title":{"rendered":"Example 2 &#8211; Risk Based Inspection Analysis of a Reactor Casing"},"content":{"rendered":"<div id=\"dt_row_1177728761982\" class=\"clearfix dt_row\"><div id=\"dt_column_2\" class=\"dt_column col-sm-12\"><div id=\"dt_row_3177728761911\" class=\"row dt_row\"><div id=\"dt_column_4\" class=\"dt_column col-sm-6\"><div id=\"dt_row_5177728761973\" class=\"row dt_row title-blck\"><div id=\"dt_column_6\" class=\"dt_column col-sm-12\"><div id=\"dt-section-head-7\" class=\"dt-section-head center  size-custom\">\r\n              <div><h2 style=\"color:#ffffff;font-size:35px\" class=\"section-main-title\">ALTA Example 3 - Accelerated Degradation<\/h2><\/div><\/div><\/div><\/div><\/div><div id=\"dt_column_8\" class=\"dt_column col-sm-6\"><\/div><\/div><div id=\"dt_row_9177728761978\" class=\"row dt_row\"><div id=\"dt_column_10\" class=\"dt_column col-sm-5\"><\/div><div id=\"dt_column_11\" class=\"dt_column col-sm-7\"><div id=\"dt_row_12177728761977\" class=\"row dt_row\"><div id=\"dt_column_13\" class=\"dt_column col-sm-12\"><div id=\"dt_text14177728761926\" class=\"dt_text\">\n<h3><span style=\"color: #000000; font-size: 1em;\">Examples provided here are purely for illustrating software features and functionality.<\/span><\/h3>\n<\/div><\/div><\/div><\/div><\/div><\/div><\/div><div id=\"dt_row_15177728761993\" class=\"clearfix dt_row\"><div id=\"dt_column_16\" class=\"dt_column col-sm-12\"><div id=\"dt_row_17177728761989\" class=\"row dt_row\"><div id=\"dt_column_18\" class=\"dt_column col-sm-12\"><div id=\"dt_row_19177728761950\" class=\"row dt_row\"><div id=\"dt_column_20\" class=\"dt_column col-sm-1\"><\/div><div id=\"dt_column_21\" class=\"dt_column col-sm-5\"><div id=\"dt_text22177728761995\" class=\"dt_text\">\n<h3><span style=\"color: #0093d5;\">Example 2 &#8211; Risk Based Inspection Analysis of a Reactor Casing<\/span><\/h3>\n<p><b>Download Example File for <a href=\"http:\/\/www.reliasoft.com\/alta\/examples\/rc1\/alta_example_1_V10.rsgz10\" download=\"\">Version 10 (*.rsgz10)<\/a> or <a href=\"http:\/\/www.reliasoft.com\/alta\/examples\/rc1\/alta_example_1_V9.rsr9\" download=\"\">Version 9 (*.rsr9)<\/a><\/b><\/p>\n<h3><span style=\"color: #0093d5;\">Background<\/span><\/h3>\n<p>This example demonstrates how to perform a risk based inspection analysis using the RBI software.<\/p>\n<p>For this example, you will be analyzing a reactor casing that was installed on March 13, 2006 with a planned replacement date of March 13, 2023. The reactor is subject to general thinning corrosion and possible amine cracking. On average, the reactor contains 15 tons of liquid ammonia with the upstream connected equipment containing another 35 tons of liquid ammonia. Management estimates that the loss of production due to reactor downtime is $100,000 per day. The acceptable safety risk is 2,500m<sup>2<\/sup> and the acceptable financial risk is $3 million. You must determine if the reactor requires any further inspections before the planned replacement date.<\/p>\n<h3><span style=\"color: #0093d5;\">Analysis<\/span><\/h3>\n<p><b>Step 1<\/b>: Create the system hierarchy.<\/p>\n<\/div><div id=\"dt_image23\" class=\"dt_image\"><div class=\"image-align-center\"><img decoding=\"async\"  class=\"img-responsive style-default\" src=\"http:\/\/www.safetyangel.com\/recdev\/wp-content\/uploads\/2016\/11\/v1.png\" alt=\"\"\/><\/div><\/div><\/div><div id=\"dt_column_24\" class=\"dt_column col-sm-5\"><div id=\"dt_text25177728761974\" class=\"dt_text\"><b>Step 2<\/b>: Enter the general properties.<\/div><div id=\"dt_image26\" class=\"dt_image\"><div class=\"image-align-center\"><img decoding=\"async\"  class=\"img-responsive style-default\" src=\"http:\/\/www.safetyangel.com\/recdev\/wp-content\/uploads\/2016\/11\/v2.png\" alt=\"\"\/><\/div><\/div><div id=\"dt_text27177728761965\" class=\"dt_text\"><b>Step 3<\/b>: Select the applicable damage factors that apply to the component.<\/div><div id=\"dt_image28\" class=\"dt_image\"><div class=\"image-align-center\"><img decoding=\"async\"  class=\"img-responsive style-default\" src=\"http:\/\/www.safetyangel.com\/recdev\/wp-content\/uploads\/2016\/11\/v3.png\" alt=\"\"\/><\/div><\/div><div id=\"dt_text29177728761992\" class=\"dt_text\"><b>Step 4<\/b>: Enter the damage factor properties.<\/div><div id=\"dt_image30\" class=\"dt_image\"><div class=\"image-align-center\"><img decoding=\"async\"  class=\"img-responsive style-default\" src=\"http:\/\/www.safetyangel.com\/recdev\/wp-content\/uploads\/2016\/11\/v4.png\" alt=\"\"\/><\/div><\/div><\/div><div id=\"dt_column_31\" class=\"dt_column col-sm-1\"><\/div><\/div><\/div><\/div><\/div><\/div><div id=\"dt_row_32177728761952\" class=\"clearfix dt_row\"><div id=\"dt_column_33\" class=\"dt_column col-sm-12\"><div id=\"dt_row_34177728761981\" class=\"row dt_row\"><div id=\"dt_column_35\" class=\"dt_column col-sm-12\"><div id=\"dt_row_36177728761999\" class=\"row dt_row\"><div id=\"dt_column_37\" class=\"dt_column col-sm-1\"><\/div><div id=\"dt_column_38\" class=\"dt_column col-sm-5\"><div id=\"dt_text39177728761970\" class=\"dt_text\"><b>Step 5<\/b>: Enter the consequence properties.<\/div><div id=\"dt_image40\" class=\"dt_image\"><div class=\"image-align-center\"><img decoding=\"async\"  class=\"img-responsive style-default\" src=\"http:\/\/www.safetyangel.com\/recdev\/wp-content\/uploads\/2016\/11\/v5.png\" alt=\"\"\/><\/div><\/div><div id=\"dt_text41177728761942\" class=\"dt_text\"><b>Step 6<\/b>: Calculate the component results and review the values shown next. (<i>Note that most of the dates shown in the following pictures are based on the date when the analysis was performed in the sample project. If you repeat the analysis from scratch, or if you recalculate, the specific dates in your results will be different.<\/i>)<\/div><\/div><div id=\"dt_column_42\" class=\"dt_column col-sm-5\"><div id=\"dt_image43\" class=\"dt_image\"><div class=\"image-align-center\"><img decoding=\"async\"  class=\"img-responsive style-default\" src=\"http:\/\/www.safetyangel.com\/recdev\/wp-content\/uploads\/2016\/11\/v6.png\" alt=\"\"\/><\/div><\/div><div id=\"dt_text44177728761959\" class=\"dt_text\">As shown above, the <b>Area Based Risk<\/b> exceeds the risk target on November 10, 2018. And, as shown in the <b>Recommended Inspection(s)<\/b>node, on that date you must perform two inspections: one for the thinning damage and one for amine cracking damage. These must be at least poorly effective (a class &#8220;D&#8221; inspection). If the inspections do not find anything out of the ordinary (i.e., everything is found to be as currently predicted), then the potential risk is lowered to an acceptable level by the time the reactor is due to be replaced.<\/div><\/div><div id=\"dt_column_45\" class=\"dt_column col-sm-1\"><\/div><\/div><\/div><\/div><\/div><\/div><div id=\"dt_row_46177728761994\" class=\"clearfix dt_row\"><div id=\"dt_column_47\" class=\"dt_column col-sm-12\"><div id=\"dt_row_48177728761974\" class=\"row dt_row\"><div id=\"dt_column_49\" class=\"dt_column col-sm-12\"><div id=\"dt_row_50177728761928\" class=\"row dt_row\"><div id=\"dt_column_51\" class=\"dt_column col-sm-1\"><\/div><div id=\"dt_column_52\" class=\"dt_column col-sm-5\"><div id=\"dt_text53177728761988\" class=\"dt_text\">\n<p class=\"caption\" style=\"text-align: left;\">The following plot shows these dates graphically.<\/p>\n<\/div><div id=\"dt_image54\" class=\"dt_image\"><div class=\"image-align-center\"><img decoding=\"async\"  class=\"img-responsive style-default\" src=\"http:\/\/www.safetyangel.com\/recdev\/wp-content\/uploads\/2016\/11\/v7.png\" alt=\"\"\/><\/div><\/div><div id=\"dt_text55177728761927\" class=\"dt_text\">Note that while the financial risk will not have exceeded its risk target limit on November 10, 2018, it will exceed that limit sometime in 2019 if you do nothing. By performing the recommended inspections on November 10, 2018 (and assuming that nothing out of the ordinary is found during those inspections) you also ensure that the financial risk will not exceed its limit before the planned replacement date. The Financial Risk plot shows this.<\/div><\/div><div id=\"dt_column_56\" class=\"dt_column col-sm-5\"><div id=\"dt_image57\" class=\"dt_image\"><div class=\"image-align-center\"><img decoding=\"async\"  class=\"img-responsive style-default\" src=\"http:\/\/www.safetyangel.com\/recdev\/wp-content\/uploads\/2016\/11\/v8.png\" alt=\"\"\/><\/div><\/div><div id=\"dt_text58177728761945\" class=\"dt_text\">\n<h2>Discussion<\/h2>\n<p>Based on the analysis the reactor will require additional inspections before the planned replacement date, but as long as they are at least poorly effective, and nothing out of the ordinary is found, then the area and financial risks will likely remain within the limits determined by the management.<\/p>\n<\/div><\/div><div id=\"dt_column_59\" class=\"dt_column col-sm-1\"><\/div><\/div><\/div><\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"fullwidth.php","meta":{"footnotes":""},"class_list":["post-17052","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"http:\/\/www.safetyangel.com\/recdev\/wp-json\/wp\/v2\/pages\/17052","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.safetyangel.com\/recdev\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/www.safetyangel.com\/recdev\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/www.safetyangel.com\/recdev\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.safetyangel.com\/recdev\/wp-json\/wp\/v2\/comments?post=17052"}],"version-history":[{"count":3,"href":"http:\/\/www.safetyangel.com\/recdev\/wp-json\/wp\/v2\/pages\/17052\/revisions"}],"predecessor-version":[{"id":17066,"href":"http:\/\/www.safetyangel.com\/recdev\/wp-json\/wp\/v2\/pages\/17052\/revisions\/17066"}],"wp:attachment":[{"href":"http:\/\/www.safetyangel.com\/recdev\/wp-json\/wp\/v2\/media?parent=17052"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}